婆婆和儿媳同时怀孕,傻眼了吧!

时间:6年前 (2018-01-29)来源:怀孕期阅读量: 958

导读:

点击上方‘蓝字关注

The completion of this huge project docking, arm mech pops up on a mechanical arm is fine, the mechanical arm HD camera flexible welding site exploration degree, sitting in the cabin of the mech engineers determined a robot welding degree, let all the robot climb back up behind their toolbox, continue do other work.

The driver powersuits Engineer in just this series process, both carrying a huge ten meter long aluminum tube manual work, and the alignment of the live medium technology completed, final supervision robot the fine precision welding completed work. The entire dam, a spectacular building that was visible in the age of the magic Empire, is being methodically constructed.

At dawn, the Republic was prepared to protect the eastern cities with this super defense system. Meanwhile, in order to ensure the safety of the freshwater source of the blue river, the entire Republic of the Republic built a large number of artificial channels for the blue river to make full use of the blue river water.

This is why there is a mecha Empire Project now strong demand. Big city anti tsunami dam system, is actually not what big projects, only two thousand level collocation engineering mecha, with each other, can be easily completed within a year. Fifty km anti tsunami giant dam system. These giant dams will only be built at a height of thirty-five meters. Because of the huge tsunami of thirty-five meters, only after falling on the ocean, or after a big earthquake on the ocean floor will it erupt on the surface of the sea. As for the tsunami that swept over the land, a few meters high would be sky high. Only in the face of Western sea to maintain that aluminum tube can be mixed dam territory, for the other part, directly map dug pile seven or eight meters dam can block the annual days of the tide to dip the ze.

For their own safety, the cities in the western plains have allocated a sum of money to support the construction of the dam. Good news for the cement industry in Liming republic. Of course, this is only the city level defense plan, and as for the national defense plan, the scale is more massive.

Compared with the tide defense plan, dawn Republic was determined to complete the elimination and invisible. Elements of the 53 year winter, the dawn of the Republic in the west of the ground, carried out three hundred and seventy-two underground nuclear explosions, each nuclear explosion, equivalent to one thousand tons. Such explosions cause seismic waves to occur repeatedly on the western continental plates

(this chapter unfinished, ZOZ) of shock wave, the dawn of the Republic, several Western underground space. These underground spaces, upward, are hundreds of meters in diameter, similar to the diameter of the capillaries, and are only five or six km from the surface.

There is a saying, "the conscience of a city lies in the sewer.". A city has been soaked by rain because the city's underground drainage system is not good. On the west coast, and Yuan Miao in elements of the tide is astronomical tide once a year and ravaged, water withdrawal is not clean, the whole western, year-round flooded. If the tide once a year, and then a month later, all the water to the river, the water, all disappeared, leaving dry land, so long as that month all human beings on earth to hide in the city, there is no effect of what.

Yes, the Republic of dawn is so prepared, ready to dig an epic pit for the landed sea tribe. A large flood caused by astronomical tides, all within a month to clean the pit.

This huge project, Ren Di originally wanted to use "sewer" for this huge project name, but the dawn Republic which helped the staff officer this is really could not bear any Di level name.

Look at this great plan, Wang Long with some undeniable tone, said: "the Chinese side, called King Yu combating the flood," summer "plan. What do you think?." Wang Long looked at the people around him, then his eyes fell on dee. Although it is asking, but the meaning is obvious, if the lower level of the naming scheme, do not mention.

Eventually, the summer plan was implemented by the state. It plans to drill holes above twenty previously explored underground spaces in the western territories, and then dig up canals in various parts of the western earth. These usually slightly higher than婆婆和儿媳同时怀孕,傻眼了吧! the surface of the artificial river bed is not low-lying water, when astronomical tide comes, when the water level in the west, natural river surge, it is these channels are filled with water, then these rivers will water into, fifty meters in diameter in the courtyard, poured into the underground space.

In this way, every time the sea soaks up the land, the tide flows into the channel and then goes into a large artificial channel that eventually seeps into the ground. As for so many sea water, what are the impacts on the ecosystem in the underground world? This way I die die. Ren DI water expense. If the sea is filled with the ground, it is even good for the stability of the ground.

Huge rigs, drilling under the power of nuclear power, are heading for the underground. A large amount of soil is excavated to the surface at any moment. Although the plan is to dig out a fifty meters in diameter of the channel to the underground, but in fact, the surface forms a three hundred meters of vulnerability, this vulnerability in a variety of working platform for large underground drilling machines.

And the western surface of the earth, a large number of artificial river is being excavated, now flooding the continent of the tide is only astronomical tide, the heyday of Ze Ze land is not

最新文章

网友跟帖

关于我们 | 联系我们 | 版权申明 | 免责声明1111

本站所收录作品、热点评论等信息部分来源互联网,目的只是为了系统归纳学习和传递资讯!

免责申明:所有作品版权归原创作者所有,与本站立场无关,如不慎侵犯了你的权益,请联系我们告知,我们将做删除处理!

Copyright 2017-2018 怀孕期 版权所有 湘ICP备15012852号